Mr. DU...
S...
....
100511 PLOIESTI
Romania
MS in Refinery and Petrochemistry Chemical Engineer educational
background, strategically minded but operationally driven passionate NACE
Coating Inspector Level 3 Peer Review /MICorr Level 2
Certified Insulation and
Fireproofing Inspector professional, with more than 16 years’ experience
inspection and engineering in Refinery, Gas/Oil, Petrochemical or Petroleum
related industries in the field of coating, lining and wrapping , onshore and offshore
from Contractor to Client Representative, seeking long term client staff position in the industries like Petrochemicals, Oil and
Gas, Power projects, Industrial construction, where I
can utilize my skills and abilities in the technical field that offers professional
growth while being resourceful, innovative and flexible.
Secure
a challenging engineering position where my team player attributes, experience,
and communication skills can be utilized in obtaining personal career goals and
those of the employer.
Education
Master of Science in Chemical
Engineering, Petroleum-Gas University of Ploieşti
NACE
Coating Inspector CERTIFIED LEVEL 3 –PEER REVIEW (CIP 15960, Aberdeen, UK)
Institute of Corrosion-ICorr Level
2 Insulation Inspector-Certification no. 3179 (Rotherham, UK)
Institute of Corrosion-ICorr Level 2 Fire proofing
Inspector-Certification no. 3180 (Rotherham,
UK)
Approved SAUDI ARAMCO Coating Inspector
(JER-35421-LET-CNVP-TPSA-2011-000152)
Approved SAUDI
ARAMCO Insulation Inspector (JER-35421-LET-CNVP-TPSA-2011-000401)
Approved SAUDI
ARAMCO Fireproofing Inspector (JER-35421-LET-CNVP-TPSA-2011-000401)
Member of The National Association
of Corrosion Engineers (NACE INTERNATIONAL) and Institute of Corrosion, Icorr,
UK.
RECOGNIZED Inspector CAFCO FIREPROOFING FENDOLITE M II (Aberdeen, UK)
Expertise
and Services
-Experience
includes construction and shutdown coating inspection, predictive and
preventive maintenance, and reliability and health assessment of applied
coating.
-Coating, Insulation and Fireproofing and Refractory
Project Management, Inspection and Supervision.
-Coating Failure Analysis and damage assessment,
technical assistance.
-Conduct root cause analysis (RCA) as certified
facilitator to resolve specific coating failures.
-Act as a professional mentor to less senior specialists
and transfer implicit knowledge to specialists and other engineers.
-Knowledge
of NACE and other international codes and standards for Painting, coating,
lining, wrapping, insulation and surface preparations.
-Familiar and working experience with relevant
NORSOK R-004 STANDARD for PIPING and EQUIPMENT INSULATION (Rev.2, June 1999)
and NORSOK M-501 SURFACE PREPARATION and
PROTECTIVE COATING(Edition 6, February 2012), NORSOK STANDARD S-002 WORKING
ENVIRONMENT(Rev.4, August 2004), NORSOK STANDARD L-002 PIPING SYSTEM LAYOUT,
DESIGN and STRUCTURAL ANALYSIS(Edition 3, July 2009).
-Familiar and working experience with DEP (Design and
Engineering Practice) Manual for Dutch THERMAL INSULATION-Amendments and
Supplements to the CINI Handbook, January 2005, and PIP insulation standards.
-Comprehensive knowledge of Corrosion Prevention,
Protective Coatings, Heat Insulation Systems, Refractory and Fireproofing.
-Prepare
and /or review coatings / insulation engineering specifications for the
fabrication of process equipment and piping.
-Provide
coatings service life evaluations for items currently in service and knowledge
of preservation techniques for assets and equipment.
-Knowledge
of all types of refinery equipment: columns, drums, heat exchangers, furnace,
boilers, flares, tanks, and piping and issue recommendations for repair of
corroded or damaged components.
-Ability
to effectively work with a cross-functional team of individuals from diverse backgrounds,
good experience with a large Contractor and Sub-contractor staff, working
employing personnel of different nationalities, levels and cultures.
-Previous
experience of leading a team of engineers, supervisors, technicians and
co-ordination with specialized coating contractors and their manpower.
-Ability
to evaluate or develop new technologies, services, and tools within the
coatings and insulation areas.
-Experience of Project Engineering and delivering
consistently to schedule.
-Understanding of key lessons learnt from past projects
and how to avoid on current projects.
-Good
computer skills and literate in inspection IMS software.
-Team player and leader, planning and management of
people.
-Personally meticulous, disciplined, self motivated and
well organized.
Professional
Training
-Training
in-site on ExxonMobil Development Company Operations Integrity Management
System (OIMS) and ExxonMobil Capital
Projects System (EMCAPS). ExxonMobil Development Company utilizes two main
management systems to manage projects i.e. OIMS and EMCAPS. Training outlined
ExxonMobil Development Company's management system that allows for recognition,
evaluation, elimination and/or mitigation of process hazards in upstream
facility design, PNG February 2013.
-10 days AGIP KCO, HSE training(compressed
gasses, scaffolding, safe lifting rigging, Snip ROK, electrical hazard safety,
risk assessment, risk assessment w/shop, safe working at height, confined space
highlights, hazcom), KASHAGAN EAST FIELD DEVELOPMENT EXPERIMENTAL PROGRAMME,
April 2007.
-SICON
Training, Mellitah, Snamprogetti Libya Branch, August, 2005.
-Reliability
and security of chemical and petrochemical oil plants-1991.
-Protection
against corrosion in chemical and petrochemical plants-1992.
-Barzan
Onshore EPC Project (SHE&S full induction , manual handling, JSO Card, Heat
Stress, TSTI/5X5, working at height, grating removal, PTW roles &
responsibilities, Confined Space Entry, Chemical Awareness, Defensive
Driving(Theory), Defensive Driving(Practical).
Personal
Data
Nationality: EU-ROMANIAN.
Foreign Language: Fluent in English, written and spoken, Romanian.
Status: Single, one child.
Address (see top page).
Employment History
September
2, 2013-Up the present
JGC-JAPAN
GAS CORPORATION, BARZAN PROJECT QATAR, CLIENT RAS GAS QATAR
Site
Coating Insulation Fireproofing and Refractory Quality Advisor
-Assigned from JGC
JAPAN GAS CORPORATION as a Site Coating
Insulation Fireproofing and Refractory Quality Advisor representative on
the new construction of Barzan project, client RASGAS Qatar.
-Responsible
for all engineering coating, insulation, fireproofing and refractory site
issues, such us: issue NCR status and disposition, issue SDR (specification
deviation request), FTR (Field Trouble Request), SI (Site instruction), FCS (Field
Change Sheet), EIR (Engineering Inspection Report), PIS(Painting Inspection
Survey), IIS(Insulation Inspection Survey).
-Daily
coordination of the entire ISP coating/insulation/fireproofing JGC inspector’s
crew.
-Operate
internal JGC EDIS software (Integrated Document Management System), Version
6.0,
-Attend
all QA/QC meetings with the client management and contractor and
subcontractors.
-Responsible
for evaluation, review and approval of quality control documents, i.e. MS, ITP,
QCP for coating, insulation and fireproofing
submitted by the main subcontractors, CCC, QCON, NSH, CAPE, DESCON,
KAEFER.
-Coordinate
joint surveys with RASGAS coating, insulation inspectors and manage clearance
of all issued active FTR (Field Trouble Report), TQ (Technical Query), FDC
(Field Design Change) and NCR (Non Conformance Report).
October
24, 2012-September 2, 2013
CJJV-
CHYIODA JAPAN GAS CORPORATION- EHL
PNG LNG Plant Project (EPC3)
Port Moresby, Papua
New Guinea, Client ExxonMobil Development Company.
Site
Coating and Insulation Quality Advisor
-Assigned from CJJV
CHYIODA JAPAN GAS CORPORATION as a Site Quality Advisor Coating and Insulation
representative on the new construction of train 1 and 2 for EHL PNG LNG Plant
Project (EPC3).
-Responsible
for all QA/QC coating, insulation, fireproofing and Casting, Gunning and Bricks Lining activities for refractory installation and inspection status
(Installing Refractories in SRU units,
Refractory Dry Out Procedure for TGT Line Heaters Burners Type XV, Refractory
Dry Out Procedure and Execution for Tail Gas Incinerators/Waste Incinerators
for Train 1 and Tran 2-B19-F301, B19-F302, B19-F701, B19-F702 and B10-Y002 by
using Gouda Refractories(bricks, mortar,
castable and moldable) according to API
Standard 936, API Publication 2218-Fireproofing Practices, ASTM C181-11, ACI
547R-79, ASTM C71-08, ASTM C134-95, ACI SP-57, and their specific results on TRAIN 1 and
TRAIN 2, common process and utilities areas of PNG LNG EPC3 gas plant.
-Daily
coordination of the entire coating/insulation/fireproofing CJJV inspector’s
crew.
-Operate
IDMS (Integrated Document Management System), Version 6.0,
-Attend
all QA/QC construction and engineering client ExxonMobil meetings, also with
the management of contractor and subcontractors.
-Review
and confirm all Subcontractor ACS’s- A CHECKSHEETS has been completed as per
Win PCS before issuing DMCC-DISCIPLINE MECHANICAL COMPLETION CERTIFICATE
REQUEST in respect of the subject subsystem discipline.
-Responsible
for evaluation, review and approval of
quality control documents, i.e. MS, ITP, QCP for coating, insulation and
fireproofing submitted by the main
subcontractors, MESSEI, CBI, CCC, DAEWOO, BAMCLOUGH.
-Identify
& report Non-conformities NCR and issue punch lists to specified
requirements. Verify agreed corrective action with client inspectors.
-Coordinate
joint surveys with ExxonMobil coating and insulation inspectors and manage
clearance of all issued active SR (Surveillance Report), MAR (Material Approval
Request), TQ (Technical Query), LBE (Log Book Entry), FDC (Field Design Change)
and NCR (Non Conformance Report).
December
25, 2010-April 01, 2012
TECHNIP
Saudi Arabia, 2265-(JERP) JUBAIL EXPORT REFINERY PROJECT-PACKAGE 2A, SATORP
(SAUDI ARAMCO TOTAL REFINING and PETROCHEMICAL COMPANY)
LEAD
QC Coating and InsulationInspector
-Assigned
from TECHNIP Saudi Arabia to 2265-(JERP) JUBAIL EXPORT REFINERY PROJECT-PACKAGE
2A, as a Lead QC Coating and Insulation Inspector to lead the QC Coating and
Insulation Inspection activity of six BGAS/NACE certified coating and
insulation inspectors.
-Also
in charge with the overall daily Inspection Pre casting Coating 2265 unit 2A
and a totally of 165000 mp
Coating(85000 square meters in SINOPEC AREA and 79000 square meters in NESMA
AREA), also 32000 square meters hot,
cold acoustic insulation for 365
equipments in unit 2A.
-Manage
Coating and Insulation Reports and RFI (Request for Inspection) management by
SMC issued and submitted by the main subcontractors NESMA and Partners, ASTALDI,
SINOPEC, KAEFER, RB HILTON, for coating in precasting area, for heat
conservation insulation, cold conservation insulation and acoustic conservation
insulation for pipes and equipments by issuing insulation inspection reports on
a daily basis, for PROCESS AREA ZONE and all pipe racks.
-Inspection
and monitoring of application of insulation 2A package, as specified in Satorp Quality Control
Procedure, Project specification and ITP’s, for all columns, horizontal and
vertical equipments and vessels, troubleshoot insulation problems as they
occur, daily & weekly progress and documentation reports were submitted to
the clients, review subcontractor documentation.
-Ensure
that the require technical competencies in insulation work are sustained for
the qualified and specialized Contractor and Sub-contractor staff at all levels
and to provide mentor-ship for the development of insulation technical
professionals.
-Identify
& report Non-conformities NCR and issue punch lists to specified
requirements. Verify agreed corrective action.
-Coordinate
joint surveys with SATORP inspectors and manage clearance of all issued active
LBE and NCR.
-Attend
QA/QC weekly meetings with the COMPANY SATORP inspectors to discuss the matters
of daily inspection.
-Manage
daily RFI by Technip SMC (Site Management and Control)
May
01, 2009-October 15, 2010
TECHNIP
ITALY, 2299 PKTR PROGRAM 10+ PROJECT MHC Unit 0930-GLSA GDANSK REFINERY POLAND,
Client GRUPA LOTOS SA.
QA/QC
Coating and InsulationInspector
-Assigned
from TECHNIP ITALY
to MHC Unit 2299 PKRT GDANSK REFINERY RESIDUE UPGRADE PROJECT, during
construction/precommissioning/commissioning for the grass-root refinery project
of Mild Hydro-Cracking Unit in GLSA refinery.
-My
role was to oversee the quality of execution of mentioned tasks performed by
the main mechanical subcontractors Polimex Mostostal and its dedicated
subcontractors Riva Mariani, Kaefer, Techno Install, Izolbet, Awilo, and Wild
Engineering.
-The
scope of my daily inspection and monitoring were 32500 m² of protective coating
application and about 40000 m² of heat conservation insulation and personal protection
(8000 m² on equipment and 32000 m² on piping) according to project quality
control plan LOTOS QCP and LOTOS ITP.
My
duties included:
-Check
daily and weekly progress on protective coating documentation
-Identify
and report all NCRs(Non Conformity Reports) and issue punch list to specific
client requirements.
-Evaluate
and analyze coatings failures and issue resolutions taking into account the
specific client inspector’s requirements.
-Coordinate
joint surveys with client inspectors and manage clearance of all issued punch
list points.
-To
conduct all the specific technical tests required to asses’ proper application
of proposed protective coatings systems, according to project anticorrosion
protection specification.
-Troubleshoot
coating and insulation problems as they occur.
-Assist
when needed inspectors and supervisors of others discipliners with reference to
protective coating (steel structure protective coatings repairs, steel
structure/equipment touch up before fireproofing).
December
23, 2008-April 15, 2009
TECHNIP
FRANCE,DQR-DUNG QUAT REFINERY PROJECT, Client PETROVIETNAM- VIETNAM OIL and GAS
CORPORATION.
QA/QC
Coating and InsulationInspector
-Assigned
from TECHNIP FRANCE to TECHNIP CONSORTIUM( TECHNIP, JGC, TECHNICAS REUNIDAS) to oversee the overall daily Inspection
Reports and RFI(Request for Inspection) issued
and submitted by the main subcontractors KAEFER, LILAMA MENCO, VIVA BLAST and PREZIOSO
for heat conservation insulation, cold conservation insulation and acoustic
conservation insulation, by issuing insulation inspection reports on a daily
basis, for PROCESS AREA ZONE 1A & 1B, Units 011(CDU), 014(KTU) and 037(Fuel
Gas), and PROCESS AREAS ZONE 2, Units 012(NTU), 013(CCR), 023(LISOM).
-Inspection
and monitoring of application of insulation as specified in Quality Control
Procedure, Project specification and ITP’s.
-Ensure
that the require technical competencies in insulation work are sustained for
the qualified and specialized Contractor and Sub-contractor staff at all levels
and to provide mentor-ship for the development of insulation technical
professionals.
-Identify
& report Non-conformities NCR and issue punch lists to specified
requirements. Verify agreed corrective action.
February
01, 2007 –December 23, 2008
AKCO-AGIP KAZAKHSTAN NORTH CASPIAN
OPERATING COMPANY KASHAGAN EAST FIELD DEVELOPMENT
EXPERIMENTAL PROGRAMME.
QA/QC
Coating Insulation and Fireproofing Inspector
-Assigned
to AGIP KCO, KDPC ESKENE WEST KASHAGAN
SITE, ATYRAU CITY KAZAKHSTAN,CAM-1/KTO/KIB/KPP/KUT, to oversee the overall daily Inspection
Reports of TSA, abrasive blasting/painting and hot dip galvanizing/hot and cold
insulation/acoustic insulation/wrapping of carbon steel underground pipes, by
issuing painting inspection reports & insulation inspection reports on a
daily basis, for CAM-1 all COT tanks-north offsite extension, LPG bullets station,
Central Control Buildings, laboratory, utilities, power generation, pipe rack
51 A/B, pipe rack 53 D/E/F, pipe rack 52 A/B.
-Assigned
to AGIP KCO, KDPC ESKENE WEST KASHAGAN
SITE, to oversee the overall daily
Inspection Reports of CAM-2, all OGS areas, pump shelters, compressor shelters,
all pipe racks, to oversee and validate the daily fireproofing RFI( Request for
Inspection) submitted by the main subcontractors, GATE(GAMA & TEKFEN), MCC, BONATTI, CAPE
UK.
-Read
and clarify coating specification, carryout coating inspection, planning and
scheduling.
-Ensure
that the require technical competencies in insulation work are sustained for
the qualified and specialized Contractor and Sub-contractor staff at all levels
and to provide mentor-ship for the development of insulation technical
professionals.
-Supervise
inspection programs and prepare, review / evaluate inspection reports &
test results, develop recommendation of required work to avoid reduction in
operating parameters.
-Conduct
holiday inspection for under ground pipe coating/wrapping.
-Identify
& report Non-conformities NCR and punch lists to specified requirements.
Verify agreed corrective action.
-Study
of client’s specifications and developing the technical procedure according to
the Standards and requirements specified, attending the pre-job conference and
the periodical meetings along with the project, technical submittals to/from
concerned parties.
July
2005 –September 2006
ENI
BV-SNAMPROGETTI GENEVA,
WLGP NC-41 Gas Plant Project, Mellitah,
Libya
Coating
& Insulation Superintendent
-Assigned
to Snamprogetti Lummus Gas LTD for AGIP GAS BV LIBYA BRANCH, NC-41, MELLITAH
PLANT, natural gas processing plant, 3 trains-50 million man hour’s project, to
oversee the overall daily Inspection Reports of abrasive blasting/painting and
hot dip galvanizing/hot and cold insulation/acoustic insulation/wrapping of
carbon steel underground pipes/refractory lining activities, by issuing
painting inspection reports & insulation inspection reports on a daily
basis.
-Preparation
of Quality Control Inspection packages, including Quality Inspection Plans (QIP),
Inspection Report/Checklist (IRCL’s).
-Inspection
and monitoring of application of insulation as specified in Quality Control
Procedure and Project specification and ITP’s.
-Inspection
of cryogen insulation of different equipments in Sulphur Plant, process
equipment and Piping.
-Ensure
subcontractor activities-HYUNDAI, BONATTI, MEDITERANEAN PROGETTI-BENTINI, SECC,
are carried out in accordance with the approved customer FQCP- Field Quality
Control Plan and ITP-Inspection and Testing Plan.
-A
close working liaison with the customer AGIP GAS BV painting supervisors and subcontractor
painting inspectors in order to ensure conformity to standards and
specifications.
-In
charge with review of ITP and painting
procedure and witness qualification of paint systems, weather parameters
monitoring, inspections of surface preparation, WFT and DFT check after each
layer coating and final painting for visual check for blisters, air bubbles,
cracks, uneven painting thickness, paint drifts, witness of bond test, holiday
tests, for painting/coating.
-Inspection
of hot/cold insulation applications including materials inspection, vapor
barrier application inspection, insulation thickness check, and rock wool
filled density check.
-In
charge with close-out NCR/ PUNCH LIST FORM/SITE QUERRY issued by customer.
-Arrange
for the AGIP COMPANY to witness the inspection and attend meetings with the
COMPANY to discuss the matters of daily inspection.
-Duties
also include bricks refractory inspections for special SIIRTEC NIGI units like
catalytic reactors, catalytic converters, thermal incinerators.
-Reporting
the NCR and punch lists to the Company Representative.
March
1998 - June 2005
POLY
DELTA CHEMICALS Ltd, Offshore Drilling Platform Prometeu & Saturn
Coating
& Insulation Superintendent
-Assigned
to PETROMAR CONSTANTA to oversee the Inspection of blasting and painting
maintenance works.
-Established
a test protocol for offshore drilling platform maintenance coatings.
-Developed
a test protocol for offshore ballast tanks and immersion coatings.
-Responsible
for all aspects of inspection, HSE and Quality Control of blasting and coating
and insulation, hot, cold, acoustic according to NORSOK M-501 SURFACE PREPARATION and
PROTECTIVE COATING and NORSOK
R-004 STANDARD for PIPING and EQUIPMENT INSULATION, reporting to
Offshore Project Manager on a daily basis.
-Supervised
the day-to-day surface preparation, abrasive blasting, and painting for the
coating maintenance programme for CONSTANTA-PETROMAR field offshore.
-A
close working liaison with the client inspectors and offshore drilling platform
personnel was essential.
-Technical
inspection of work to ensure conformity to standards and specifications.
-Daily
and weekly progress and documentation reports were submitted to the clients and
QC department.
-Supervision
and training of the work force in all aspects of abrasive blasting, UHWJ and
protective coatings, inspection of all items, constant liaison with clients and
client inspectors, site application of anticorrosive coatings, final sign off.
-Ensure
subcontractor activities are carried out in accordance with the approved
Subcontractor Quality Plan.
-Inspecting
the quality of work on a day-to-day basis and ensuring that drawings data and
paint specifications are adhered to.
-Checking
that all instrumentation and materials used for the instrument works comply
with the relevant codes and standards laid down in the paint specification,
data and drawings.
-Complete
dry-docking maintenance works grit blasting and painting, steel works, hull
treatment valve and piping works, steel renewal in tanks, and treatment inside
ballast tanks.
-Measurements
of ambient conditions-relative humidity (RH), dew point, steel temperature, air
temperature.
January
1995 – December 1998
PETROCONSULT
PETROCHEMICAL Ltd, Petrochemical Design Department
Oil
and Gas Process Engineer
-Concerned
with design and checking tests of chemical plants for oil refineries, such as
desalting, CDU, VDU.
-Collaborating
directly with the specialists of UNILEVER ROMANIA
and RAYTHEON USA
companies.
June
1991 – January 1995
PETROBRAZI PETROCHEMICAL COMPLEX Romania, Production
Department
Oil
and Gas Process Engineer
-Performed
researches on various subjects in the field of zeolites, catalysis, and
chemical syntheses.
-To
accomplish these researches, performed documentary research on chemical
literature as well as target-directed experiments in laboratory and pilot
plants, worked out thermodynamics and kinetics studies, carried out mass and
heat balances.
-Processed
on computer the experimental results and drew up scientific research reports.
March
1985 – December 1986
ASTRA
REFINERY Romania,
Production Department
Field
Operator
-LPG
plant, tank storage farm, ensuring the proper operation of the equipment in the
field, keeping down the prescribed values of the parameters for the liquid
petroleum tanks.
-Worked
as a field operator and chemical laboratory assistant, in charge with plant
operation, analysis of raw materials and finished products, laboratory
analyses.
-Coordinating
and supervising plant operation, revisions and overhauls during the shift.
-Coordinating
plant shutting down and starting up in normal and emergency cases, the supply
of materials, chemical utilities, plant operation at the prescribed parameters,
including corrosion protection, products quality, revisions, repairs,
supervision of labor and fire protection
December 1984-January 1985
FERTILIZER WORKS VALEA CALUGAREASCA Romania, Production Department
Process Operator
-Worked
as a field operator, panel operator, and chemical laboratory assistant.
-Working
experience of various units, like: phosphate compounds, calcium phosphate,
sulphuric acid refining, nitrogen-based fertilizers, and concentrated
fertilizers.
Last
date updated: 20.05.2014